Field Definitions

Field Name

R/O/C

Description

Article

R

A article is the smallest unit or customer pack that can be

Example:         20000001

Site

R

A site is a facility in which Limited Brands purchases ,

    With the exception of standard cost, all other cost estimates will be performed only at the designated site ZC01.

Example:         ZC01

Costing Variant

R

Identifies the cost components used when creating a cost estimate. Examples of cost components include materials, activities, labor, and overhead.

    Click  to display the list of costing variants.

    Costing variants provide necessary information and strategy by which the system looks for information while costing an article. Select the costing variant based on purpose of cost estimates.

Example:         ZSTD

Costing Version

R

Planning version posted to during creation of cost estimate. For example version 0 represents the initial plan and actual postings; versions 1 through 999 represent alternative plan values.

    Click  to see the list of costing versions.

    The costing version defaults to 1.  However, you can change this to another version as needed.

Example:         1

Return to procedure